The Crystal (Siemens Urban Sustainability Centre)

ProjectThe Crystal (Siemens Urban Sustainability Centre)
LocationLondon
SectorOffice / Commercial
Project value£30m
ArchitectWilkinson Eyre Architects
Main contractorISG
CAB memberWindowMaster Control Systems

The Crystal is divided into a series of sectors or ‘crystals’. A mixed-mode ventilation strategy was specified so that, where seasonally possible, the office and exhibition is naturally ventilated using opening vents in the facades and roofs.

WindowMaster designed a system offering precise and intelligent three-speed control of 91 rooflights using 182 chain actuators. Intelligent control is provided by 24 MotorLink® panels which give two-way communication and position feedback to the Siemens BMS, allowing control and three-speed operation of rooflights through a KNX bus. The whole system is programmed by the BMS integrator.