Council for Aluminium in Building

South Bristol Skills Academy

ProjectSouth Bristol Skills Academy
ArchitectAtkins Walters Webster
CAB memberWindowMaster Control Systems

South Bristol Skills Academy is part of phase one of the Hengrove Park regeneration project.

WindowMaster was selected because it was able to provide a well thought out and cost effective natural ventilation solution. The original design used louvres with heaters to pre-temper the air prior to it entering the space. The final design offers a more environmentally friendly project using only high level windows, meaning that the incoming cooler air will mix with the warm air at high level, thus removing the need to preheat it and making the scheme more cost effective to install, maintain and run.